How vitessio/vt works
a. Primary Flows:
• Test Files → Test Executor → Results Comparison → Output
• Query Logs → Log Parser → Analysis Modules → JSON/Markdown Output
• VSchema + Query Analysis → Plan Analyzer → Classification Output
b. Secondary Flows:
• Database Backup → Test Environment Initialization
• Schema Information → Analysis Enhancement
a. External Systems:
• MySQL Database
• Vitess (VTGate)
• File System (for logs and backups)
Component Relationships
Create distinct zones showing:
• Input Processing Zone
• Analysis Zone
• Output Generation Zone
• Test Execution Zone
Additional Elements
a. Environment Containers:
• Test Environment
• Analysis Environment
• Reporting Environment
b. Configuration Components:
• VSchema Configuration
• Test Directives
• Database Settings
Key Design Considerations:
Modularity
• Clear separation between different utility functions
• Reusable components across commands
Data Flow
• Transformation of data from input to output
• How different components interact
Integration
• External system dependencies
• Configuration points and their impact
Extensibility
• Points where new functionality can be added
• Plugin or extension mechanisms
Use a hierarchical layout with:
• Commands at the top
• Processing modules in the middle
• Storage and external systems at the bottom
• Blue: Core processing modules
• Green: Input/Output components
• Orange: Command interfaces
• Gray: External systems
• Purple: Configuration elements