# takshit-s-1/dbmsproject-for--sriram architecture

> Architecture diagram of the GitHub repository takshit-s-1/dbmsproject-for--sriram, generated by GitDiagram from its file tree, README and a sample of source files (last updated 2026-08-14). It is an AI-made overview: check details against the source.

- Interactive diagram: https://gitdiagram.com/takshit-s-1/dbmsproject-for--sriram
- Repository: https://github.com/takshit-s-1/dbmsproject-for--sriram

## Overview

#### Purpose and entry points
This is a small hotel-management application backed by a local database. The likely runtime entry point is `app.py`; launch instructions are in `HOW_TO_RUN.txt`. `index.html` is the browser-facing interface or a static landing page.

#### Application runtime
`app.py` contains the primary application control flow: it likely accepts user actions, performs hotel-related operations, and reads or writes persistent data. Its exact framework and routes cannot be established from the supplied tree.

Paths:
- `app.py`
- `HOW_TO_RUN.txt`

#### User interface boundary
`index.html` is the repository’s only explicit frontend asset. It forms the boundary between a user’s browser interaction and the application/backend behavior exposed by `app.py`, if served by that process.

Paths:
- `index.html`
- `app.py`

#### Persistence model
The repository includes both a database file and its SQL definition/data script. `hotel.db` is likely the active local database used at runtime, while `hotel.sql` provides schema creation, seed data, export, or recovery capability.

Paths:
- `hotel.db`
- `hotel.sql`

#### Primary data flow
1. A user interacts through `index.html` or another interface initiated by `app.py`.
2. `app.py` handles the requested hotel operation.
3. The application queries or updates `hotel.db`.
4. `hotel.sql` can establish or recreate the database structure when needed.

Paths:
- `index.html`
- `app.py`
- `hotel.db`
- `hotel.sql`

#### Infrastructure and external dependencies
Persistence is local and file-based rather than a separately provisioned database service. No cloud infrastructure, container configuration, package manifest, API specification, or external service integration is visible in the provided repository tree.

Paths:
- `hotel.db`
- `HOW_TO_RUN.txt`

Main entry points: [`app.py`](https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/app.py) (Hotel Application), [`hotel.db`](https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/hotel.db) (Hotel Database), [`HOW_TO_RUN.txt`](https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/HOW_TO_RUN.txt) (Run Instructions), [`index.html`](https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/index.html) (Browser UI)

## Diagram (Mermaid)

```mermaid
flowchart TD

subgraph group_runtime["Application Runtime"]
  node_run_instructions["Run Instructions<br/>documentation<br/>[HOW_TO_RUN.txt]"]
  node_browser_ui["Browser UI<br/>static frontend<br/>[index.html]"]
  node_app["Hotel Application<br/>application entry point<br/>[app.py]"]
end

subgraph group_persistence["Local Persistence"]
  node_hotel_db[("Hotel Database<br/>local database<br/>[hotel.db]")]
  node_hotel_sql["Database SQL Script<br/>schema and seed script<br/>[hotel.sql]"]
end

node_run_instructions -.->|"launches"| node_app
node_browser_ui -->|"user actions"| node_app
node_app -->|"queries and updates"| node_hotel_db
node_hotel_sql -.->|"creates or restores"| node_hotel_db

click node_run_instructions "https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/HOW_TO_RUN.txt"
click node_browser_ui "https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/index.html"
click node_app "https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/app.py"
click node_hotel_db "https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/hotel.db"
click node_hotel_sql "https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/hotel.sql"

classDef toneNeutral fill:#f8fafc,stroke:#334155,stroke-width:1.5px,color:#0f172a
classDef toneBlue fill:#dbeafe,stroke:#2563eb,stroke-width:1.5px,color:#172554
classDef toneAmber fill:#fef3c7,stroke:#d97706,stroke-width:1.5px,color:#78350f
classDef toneMint fill:#dcfce7,stroke:#16a34a,stroke-width:1.5px,color:#14532d
classDef toneRose fill:#ffe4e6,stroke:#e11d48,stroke-width:1.5px,color:#881337
classDef toneIndigo fill:#e0e7ff,stroke:#4f46e5,stroke-width:1.5px,color:#312e81
classDef toneTeal fill:#ccfbf1,stroke:#0f766e,stroke-width:1.5px,color:#134e4a
class node_run_instructions,node_browser_ui,node_app toneBlue
class node_hotel_db,node_hotel_sql toneAmber
```

## Components

### Application Runtime

- [Run Instructions](https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/HOW_TO_RUN.txt): documentation · Launch instructions for the local application. · `HOW_TO_RUN.txt`
- [Browser UI](https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/index.html): static frontend · User-facing hotel interface or landing page. · `index.html`
- [Hotel Application](https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/app.py): application entry point · Handles hotel operations and persistent data access. · `app.py`

### Local Persistence

- [Hotel Database](https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/hotel.db): local database · Active file-based runtime data store. · `hotel.db`
- [Database SQL Script](https://github.com/takshit-s-1/dbmsproject-for--sriram/blob/main/hotel.sql): schema and seed script · Creates, restores, or seeds the local database. · `hotel.sql`

## Connections

- Run Instructions → Hotel Application: launches
- Browser UI → Hotel Application: user actions
- Hotel Application → Hotel Database: queries and updates
- Database SQL Script → Hotel Database: creates or restores
