How ivaros/dynamicgap works
Main Components Identification
The system can be broken down into these major components:
a. Core Planning Components:
• Gap Detection (gap_detection/)
• Gap Estimation (gap_estimation/)
• Gap Feasibility (gap_feasibility/)
• Trajectory Generation (trajectory_generation/)
• Trajectory Evaluation (trajectory_evaluation/)
• Trajectory Tracking (trajectory_tracking/)
b. Support Components:
• Scan Processing (scan_processing/)
• Global Plan Management (global_plan_management/)
• Visualization (visualization/)
• Configuration (config/)
┌─────────────────────────── Input Layer ───────────────────────────┐
• Laser Scans │ Robot State │ Global Plan │ Dynamic Objects │
• ┬───────────────────────────────────┘
• ▼
┌─────────────────────── Processing Layer ──────────────────────────┐
• ┌─────────────────┐ ┌─────────────────┐ ┌──────────────┐ │
• Scan Processing│───▶│ Gap Detection │───▶│Gap Estimation│ │
• ┘ └─────────────────┘ └──────┬───────┘ │
• ▼ │
• ┌─────────────────┐ ┌─────────────────┐ ┌──────────────┐ │
• Gap Feasibility │◀───│Gap Manipulation │◀───│ Gap Analysis │ │
• ┬─────────┘ └─────────────────┘ └──────────────┘ │
• ┼──────────────────────────────────────────────────────┘
• ▼
┌─────────────────────── Planning Layer ───────────────────────────┐
• ┌─────────────────┐ ┌─────────────────┐ ┌──────────────┐ │
• Trajectory │───▶│ Trajectory │───▶│ Trajectory │ │
• Generation │ │ Evaluation │ │ Tracking │ │
• ┘ └─────────────────┘ └──────────────┘ │
• ┬────────────────────────────────┘
• ▼
┌─────────────────────── Output Layer ────────────────────────────┐
• Robot Commands │ Visualization Data │
• ┘
Connection Types
• Double lines: ROS topic communication
Additional Elements
• Version information
• ROS node integration points
• Configuration parameters
Implementation Details
• Use standardized UML or similar notation
• Clear labels for all components
• Data types at interface points
• Critical timing loops
Key Relationships to Highlight
• Gap detection → Gap estimation → Trajectory generation pipeline
• Feedback loop between trajectory tracking and planning
• Integration with global plan management
• Visualization system connections
Remember to include notes about:
• ROS integration points
• Key configuration parameters
• Performance considerations
• Safety-critical components
This will provide a comprehensive view of the system while maintaining clarity about the core gap-based navigation concept.